Building a home at Greenhills Farm has taught me that building is more than just blocks and cement — sometimes you have to build the road first.
For the past months, we faced a serious challenge: getting materials to our ground.
Our land is in a high-hilly area. When the rainy season came, the small access path became completely inaccessible. Lorries carrying sand and murram could not reach us. Even our motorcycle, which we use daily, would get stuck in the mud.
The temporary solution that became a challenge
To keep going, we had to make an arrangement with our neighbour. We would offload all our materials — sand — at their compound, and then carry them in small bits on our heads and on the motorcycle to our site.
It was exhausting. What should take one trip was taking five. The cost doubled and the work was very slow.
The decision to pause
I had to pause everything. I stopped all material deliveries.
I told the team: Let us work on the road first. No road, no home.
The road work progress
For the last few days, that has been our main work. We have been clearing the bush, filling the muddy sections with murram and hard soil, and creating channels for the water to pass. We also worked on a small crossing that was always flooding.
It has been hard manual labour, but I am happy to say there is real progress. Today, our motorcycle can reach the ground with a full load. Soon, small trucks will also be able to come.
This experience has reminded me that a home is not built in a day. Sometimes you have to stop, make a way, and then continue.
We are now preparing to resume bringing materials to the site. Thank you to everyone who has been praying for us and supporting this journey. Your encouragement keeps us going.
I will be sharing photos and videos of the road.
Stay with us on this journey.